Midland Mainline Electrification – Bedford to Kettering

Our client needed to assess the clearance between the newly installed Overhead Line Equipment and Signal Gantries along the route.

Utilising our Trimble SX10 Scanning Total Station we were able to rapidly survey multiple structures within each midweek possession where time was limited. A total of 18 structures were scanned and data processed to produce 3D point cloud models and 2D sections. The deliverables enabled designers to successfully identify clearance non-compliances along the route and plan remedial works.